Perma-Liner Contracting L.L.C

Pipe relining · UAE

Pipe relining in the UAE. A new pipe inside the old one.

CIPP and UV-CIPP relining of sewers, drains, process and pressure pipes from DN100 to DN3000, installed from existing manholes and access points.

Crew feeding the liner into the inversion unit.
Crew feeding the liner into the inversion unit.

Overview

Relining forms a new, jointless structural pipe inside a damaged one. A resin-saturated liner is inverted or pulled into the host pipe and cured in place with steam, hot water or ultraviolet light.

We reline pipes for utilities, developers, EPC contractors, facility managers and industry in the UAE. The road, building or plant stays in use, and there is far less excavation, spoil and reinstatement than with dig-and-replace.

How we work

  1. 01

    Survey

    CCTV inspection and coded defect report to confirm the pipe can be relined.

  2. 02

    Design

    Liner thickness designed to the structural class and loads the host pipe demands.

  3. 03

    Prepare

    Cleaning, root and debris removal, and bypass pumping where flow must continue.

  4. 04

    Install and cure

    Inversion or pull-in, then steam, hot-water or UV curing.

  5. 05

    Verify

    Lateral reinstatement and a post-lining CCTV survey for handover.

Typical applications

  • Cracked, broken or deformed sewers and drains
  • Leaking joints, infiltration and root intrusion
  • Pipes under roads, buildings and live plant
  • Bends, vertical stacks and difficult access

Questions

Frequently asked questions.

What is pipe relining?

Relining installs a resin-saturated liner inside the existing pipe and cures it in place, forming a new pipe without digging a trench.

What pipe sizes can be relined?

Our lining range covers DN100 to DN3000 across CIPP, UV-CIPP, spray-in-place and spiral-wound methods.

Do you need to dig?

In most cases no. Work is done from existing manholes or access points. Small pits are needed only where there is no access.

How do you check the result?

Every relined section is surveyed by CCTV after lining, and the footage and report are handed over with the project records.

Contact

Tell us about your pipeline.

Share the location, pipe size and material, length and the problem you are seeing. We will reply with next steps.

Office
Perma-Liner Contracting L.L.C
P.O. Box 113603
Dubai, United Arab Emirates

Your enquiry is sent directly to our office. We will reply by email.