Project stories

Short stories from completed rehabilitation and inspection projects: the problem, how it was solved and the result.

Rehabilitation

Renewing pipes without digging.

The broken invert before repair, the patch liner with its sealed end, and the walk-through inspection after lining.

Rehabilitation · GRP pipe · Singapore

A 1600 mm GRP pipe, broken at the invert, made safe without digging

Structural CIPP patch liners hold a damaged pipe in service while the long-term options are decided.

Read the story →
A barricaded work front in a housing estate, the liner being fed into a chamber, and a lined pipe at a chamber connection.

Rehabilitation · Drain-lines · Singapore

16 km of drain-lines, relined beneath busy housing estates

Trenchless renewal of 150 mm to 300 mm sanitary drain-lines, carried out while residents went about their day.

Read the story →
Steel reinforcement ready for winding, the profile strip going down the manhole, and a lined pipe at a manhole with flow running.

Rehabilitation · Trunk sewer · Singapore

10 km of trunk sewer, relined with the flow still running

Spiral-wound lining for sewers from 600 mm up to 2.2 m in diameter.

Read the story →
Lifting the liner, lowering it into the access pit, and preparing the liner end.

Rehabilitation · Seawater cooling · Singapore

DN1500 and DN1800 seawater cooling lines, relined with UV-cured GRP

Large-diameter cooling pipes renewed from the inside, worked from access pits.

Read the story →
The same pipe before cleaning and after lining.

Rehabilitation · Water treatment plant

Two weeks, one shutdown: relining pipework inside a working waterworks

More than 50 m of corroded DN450 and DN600 pipe renewed without stopping the plant.

Read the story →
Corrosion before cleaning, and the finished lining.

Rehabilitation · Public park

Bringing a 135 m water main back to full bore, under a public park

Heavy corrosion cleared and the main relined from compact pits, with the park open throughout.

Read the story →
Encrusted main before works, and the spray-applied lining after.

Rehabilitation · Housing estate

CIPP and spray lining, combined to renew a DN700 main beneath a housing estate

Bends, branches and diameter changes, under a courtyard, a car park and a supermarket loading bay.

Read the story →
Liner wet-out, the prepared liner, and the finished main.

Rehabilitation · Water main

One liner, four 45° bends

A custom-made liner followed a 55 m DN620 main through every change of direction.

Read the story →
Crew at work in the access pit, and the liner in place.

Rehabilitation · Urban road

310 m of encrusted water main, renewed in two sections

Heavy scale removed and the geometry checked before CIPP and spray lining went in.

Read the story →
The main before cleaning, and after lining.

Rehabilitation · Secure estate

240 m relined in two weeks, next to a secure estate and a school

Security clearance, school hours and airfreighted materials, all within one short window.

Read the story →
Lining fire-water mains inside a working plant.

Rehabilitation · Industrial plant

More than 3 km of fire-water mains, renewed inside a working plant

Pressure CIPP for DN100 to DN450 lines, with each work package designed on its own.

Read the story →

Contact

Tell us about your pipeline.

Share the location, pipe size and material, length and the problem you are seeing. We will reply with next steps.