500 m of new 700 mm pipe, surveyed by CCTV in a single launch

A long-range crawler survey of a newly laid pipeline on a major construction project, before handover.

The site briefing before the survey, and the crawler travelling along the new pipe.
The site briefing before the survey, and the crawler travelling along the new pipe.
Pipe
700 mm diameter, newly laid
Length
About 500 m
Launch
Single launch
Survey
Long-range CCTV crawler

On a major construction project in Singapore, a newly laid 700 mm pipeline had to be inspected by CCTV before it could be accepted. The line is about 500 m long, and we surveyed the full length in a single launch.

A new pipe needs to be checked before it is covered over and put into service. A CCTV survey records the condition of the pipe as built: the joints, the line of the pipe, any deformation or damage from installation, and any debris left inside. The record forms part of the handover, and gives the owner a baseline for future inspections.

Most crawler surveys are carried out between access points that are much closer together. Covering about 500 m from one launch point needs a crawler and cable system built for long range, with enough traction to keep moving and a clear picture all the way to the far end. A single launch also means fewer set-ups on a busy site, less time at the access point, and one continuous record of the whole line.

The work began with a briefing at the work front with the main contractor's site team, covering access, permits and the survey sequence. The crawler was then lowered in and driven the length of the pipe, with the live picture watched from the control unit at ground level. Observations were logged against their distance along the pipe.

The survey footage and report were provided to the project team as the as-built record of the pipeline.

Site briefing with the main contractor's team before the survey.
Site briefing with the main contractor's team before the survey.
The crawler travelling along the new 700 mm pipe.
The crawler travelling along the new 700 mm pipe.

Figures are taken from the project records. Client and site names are withheld.

Contact

Tell us about your pipeline.

Share the location, pipe size and material, length and the problem you are seeing. We will reply with next steps.

Office
Perma-Liner Contracting L.L.C
P.O. Box 113603
Dubai, United Arab Emirates

Your enquiry is sent directly to our office. We will reply by email.